On October 26th, the Steering Committee visited Olds Secondary School, in Olds Alberta. This High School is being built in conjunction with Olds College and they hope to have it completed by January 2010. The total cost for the project is 70 million dollars including the college portion. The high school features grades 9 to 12 with a total of 600 students and the principal is Tom Christianson.
The last building was the ELearning Facility which contains video conferencing that is State of the Art. Each E Learning Area has a Crestron control panel and an Extron Control Panel with one room being entirely white board. This facility also contains a Broadcast Media/Film Room.
To see more photos of Olds High School, click here.
No comments:
Post a Comment